Investing in the power transmission industry
How to mitigate the regulatory risk linked to the modification of the tariff rules applicable to the electricity transmission activity in the Guaranteed Transmission System?
DOI:
https://doi.org/10.21678/forseti.v0i7.1115Keywords:
Electricity transmission infrastructure, Concession contract, Regulatory law, ElectricityAbstract
The investment in electricity transmission infrastructure has the regime of Public-Private Partnerships as a regulatory policy. The projects are awarded through a tender and the subscription of the Concession Contract. However, the determination of rates is established by the referred contract and by a different regulatory framework. This generates a regulatory risk, as there are no mechanisms to mitigate the future damages that may arise after the modification of the applicable regulatory framework.
Downloads
Published
2019-08-03
Issue
Section
Artículos
How to Cite
Investing in the power transmission industry: How to mitigate the regulatory risk linked to the modification of the tariff rules applicable to the electricity transmission activity in the Guaranteed Transmission System?. (2019). Forseti. Law Review, 5(7), 166-184. https://doi.org/10.21678/forseti.v0i7.1115